Информация

The vessel is designed for unrestricted navigation area and to perform the following operations:
  • transportation of goods to/from offshore drilling rigs and production platforms;
  • ice-breaking operations
  • ice situation control
  • rescuing
  • supporting
 
pr4 3
The vessel is designed for unrestricted navigation area and designed for transportation of crude oil and oil products:
  • It is designed in compliance with high standards of environmental safety;
  • Propulsion installation and auxiliary power plant can run on both traditional fuels and clean fuel – liquefied natural gas;
  • A helideck is provided for;

The first detail for Aframax tanker

December 25, 2017 Officially

The first steel cutting for the first-in-class Aframax tanker was held at the Shipbuilding Complex “Zvezda” on December 8, 2017. The event took place in the hull production shop in the presence of important visitors and the SSC employers.

Aframax oil tankers will become the first orders of a new shipyard for large range vessel construction.  The future tankers are unique vessels. They are designed for unrestricted navigation area and designed for transportation of crude oil and oil products. The Aframax tankers are designed in compliance with high standards of environmental safety and can run on both traditional fuels and clean fuel – liquefied natural gas. The length of the tanker, construction of which officially started on December 8, will be 250 m, the beam - 44 m, deadweight - 114 kt. A helideck is provided for on the vessel.

The honorary guests on the ceremony were Andrey Shishkin, Vice-President for energetics, localization and innovations, PJSC “NK “Rosneft”, Konstantin Laptev, Head of the Machinery and Technologies Localization Department, PJSC “NK “Rosneft”, Oleg Tereshenko, Managing Director, JSC “Rosnefteflot” and Pavel Shihov, Director, Far Eastern Branch of the FAO “Russian Marine Register of Shipping”.

Spectators of the ceremonial moment also were the representatives of the partner companies, in particular,  city administration of Bolshoy Kamen and, of course, SSC “Zvezda” personnel, which is expected to make the history by joint efforts further that is to take part in construction of the vessels.

In his welcoming speech Andrey Shishkin noticed that the way which Zvezda had made in two years –from the moment of outfitting the hull production shop and till the beginning of construction of the unique vessels that will carry oil and gas of “Rosneft” company. He congratulated the enterprise employees with the beginning of steel cutting for the first modern tanker, running on natural gas motor fuel, which will be fabricated in Russia.

–Zvezda has an objective set by the state, that is to bring Russian shipbuilding to a new level, - Sergey Tseluiko, the Managing Director of the Shipbuilding Complex addressed to the audience. "The largest and the most modern vessels shall be built at our facilities, the first of which will be the Aframax tanker." And the SSC team has a lot of work to do: from steel cutting to the vessel launch. In order to fulfill these tasks, “Zvezda” has all the conditions: the most advanced equipment, and most significantly, smart and skillful specialists. Way to go!

And now the main process has been launched: in front of the audience, the ultramodern highly dynamic gas-plasma cutting machine "Omnimat 8000" in a few minutes draws from a 13 mm thick steel sheet the image of the future detail with millimeter precision.

The act of the beginning of steel cutting for the lead "Aframax" tanker was signed by Andrey Shishkin, Sergey Tseluiko and Oleg Tereshchenko. Witnesses of this important event were given memorable souvenirs - tanker silhouettes cut out by SSC "Zvezda" workers with the same machine as the first detail of the future vessel was made.

After the ceremony, the guests saw other equipment of the hull production shop operating, in particular, hydraulic press for steel plate bending, butt welding portal for plates, portal cutting and marking machine SicoMat, portals for assembling and welding the main framing, turn-over unit of plates. The machines will process details of the future tanker.

Ekaterina Shuvalova, Marina Novoselova.

News

ZVEZDA SHIPYARD RECEIVED A CONCLUSION ON DRY DOCK COMPLIANCE WITH TECHNICAL REQUIREMENTS
18 January 2022Officially
ZVEZDA SHIPYARD RECEIVED A CONCLUSION ON DRY DOCK COMPLIANCE WITH TECHNICAL REQUIREMENTS
  Zvezda Shipyard received a conclusion on Dry dock compliance with technical requirements      Shipbuilding complex Zvezda received a conclusion on Dry dock compliance with project documentation requirements. The…
SEA TRIALS OF AFRAMAX TANKER “VLADIMIR VINOGRADOV” HAVE BEEN COMPLETED  SUCCESSFULLY
14 January 2022Officially
SEA TRIALS OF AFRAMAX TANKER “VLADIMIR VINOGRADOV” HAVE BEEN COMPLETED SUCCESSFULLY
Sea trials of “Vladimir Vinogradov” tanker have been completed at Zvezda Shipbuilding complex. The second Aframax tanker was built at Zvezda SSK on request of Rosnefteflot , NK Rosneft subsidiary.…
ZVEZDA SHIPYARD HAS STARTED CONSTRUCTION OF THE 6TH ARC7 LNG CARRIER
14 January 2022Officially
ZVEZDA SHIPYARD HAS STARTED CONSTRUCTION OF THE 6TH ARC7 LNG CARRIER
Steel cutting for 6th carrier in the series of ARC7 LNG carriers was started at Zvezda Shipbuilding Complex.  Ceremony took place in the Hull Fabrication Shop. The first part was…